URGENT TECHNICAL SOLUTION PROVIDED FOR RECOVERY OPERATION

Following the supply of a full back-deck spread for a cable lay installation, Motive was again commissioned by the subsea contractor to provide an urgent recovery solution when the product suffered damaged subsea.

Overview

200Te SPOOLING WINCH

CUSTOM-MANUFACTURED REEL

Motive offered a 200Te Spooling Winch and custom-manufactured reel with a core diameter of 2.8mtr to accommodate the minimum bend radius of the product to be recovered.

Our in-house team fully designed, engineered, and loaded out a suitable reel, from raw steel through to end product within just 7 days.

This project demonstrated Motive’s ease and ability to deliver a technical solution, working expertly to bring the project from concept to reality within an extremely limited timeframe.

Additional products and services to supplement the project included:

  • Reel Lifting Arrangement
  • 10Te Winch
  • Personnel to commission/install equipment
  • Transportation direct to the mobilisation site

7 Days

Solution designed, manufactured, and supplied within just 7 days

Well-equipped Facility

No job too big or too small

Bespoke

Innovative design and engineering solutions

Deep Ocean01

The client was happy with the service received, with the Lead Engineer commenting on the proactive approach taken by Motive to provide a viable solution:

Happy with the service. Motive takes a very proactive approach to business.

- Carlo Bezzi, Lead Project Engineer, DeepOcean
Deep Ocean02
Deep Ocean04