TIME-CRITICAL, CERTIFICATION & INSPECTION MULTI-WORK SCOPE
Enhancing efficiency: Integrated Certification & Inspection team expedite comprehensive workscope during critical docking period.
Overview
EQUIPMENT SUPPLIED
200Te Spooling Winch
40Te Traction Winch
Empty Drum suitable for 86mm Wire Rope
LMA450 Wire Rope NDT Machine
Wire Rope Consumables
Wire Rope Service Tool Container
200Te of Testing Equipment
Rope Access Equipment
NDT Equipment
Motive Certification & Inspection were hired to carry out a multi-scope of work during a critical 14-day docking period. Delivered by a single team, the work scope had to be completed within a small window of opportunity on-board a DSV/construction vessel.
The Challenge
Due to the ongoing COVID Pandemic, the team had to be versatile to carry out:
- LOLER
- Wire Rope Spooling
- Wire Rope Electromagnetic Inspection
- Crane Wire Rope Sample Removal
- Re-terminations
- Crane NDT Examination
- Critical load path NDT of cranes and dive system annual works
- 5 Yearly Crane Load Testing
Additionally, all crane blocks were to be removed, sent to our workshop for full 5 yearly overhaul, and returned in time for the crane testing to commence.
The Solution
Motive Certification & Inspection supplied a multi-disciplined team of 7 to carry out the complete work scope from start to finish.
At the project start, 5 crane blocks (ranging up to 200Te) were removed and returned within 10 days.
The project was managed by Motive Spooling & Inspection in Aberdeen. All equipment, procedures, and work packs were sent directly to the vessel where our team was on-site, taking ownership of the complete scope.
The work was completed within the opportunity window, with no delays. Our client was fully satisfied with the result which saw the vessel back to work within a 14-day period.