DELIVERING OUR CAPABILITIES ACROSS A RANGE OF SECTORS
The leading energy industry specialist
Motive Offshore Group: our vision is that Motive will be the leading energy industry specialist, always prioritising the development of a highly skilled team, trusted to create sustainable, multisector solutions, that are innovative and tailored to our clients’ needs.
CASE STUDIES
JDR AND MOTIVE: THIRTY-EIGHT PROJECTS THAT DEFINE A PARTNERSHIP
Motive has delivered 38 work scopes for JDR to date. The first supported JDR with the provision of a 5Te Tensioner for the load-out of 57.5 kilometres of inter-array cables, marking the beginning of an ongoing supply of tensioner packages and operators, supporting various offshore wind projects.
CABLE HANDLING: MOTIVE COMPLETES MAJOR PROJECT IN TAIWAN
Providing full project and site management throughout, Motive delivers significant cable handling project for valued client CWind Taiwan
FIVE-PHASE UMBILICAL TESTING WORK SCOPE
Contracted by Subsea7, Motive AS completed the work scope for Ærfugl Phase 1 within 10 months, including procurement, design, engineering, and testing services.
SMART UNDER-ROLLER APPROACH TO PIPELINE REPLACEMENT WORKS
In a slight departure from more typical Motive projects, this case study explores the application of a Crane Loaded Under Rollers Package for the installation of semi ridged waste disposal pipework.
EARLY ENGAGEMENT DELIVERS FOR OFFSHORE RENEWABLES PROJECT
Motive helps client secure win through cost-saving, time-efficient solution.
BESPOKE SUBSEA DEPLOYMENT SOLUTION OVERCOMES SHALLOW WATER CHALLENGES
Tasked with creating an efficient means to lay umbilical in ultra-shallow waters that ruled out a more conventional topside approach, Motive developed a bespoke subsea deployment solution.
MOTIVE DELIVERS STELLAR SOLUTION FOR ORBEX PRIME SPACE PROJECT
Proud to partner with orbital launch services company Orbex, headquartered in Forres, this project began in 2021 and marked Motive’s first major involvement in the aerospace industry, perfectly demonstrating the versatile nature of Motive Engineering capabilities.
MOTIVE APAC DELIVERS FIRST COMPLETE CABLE HANDLING SOLUTION IN TAIWAN
How our multi-disciplined task force approach delivers fully streamlined solutions.
COLLABORATIVE WORKING - THE KEY TO EFFECTIVE PROJECT EXECUTION
Every once in a while, a thoroughly enjoyable project comes along.
TIME-CRITICAL, CERTIFICATION & INSPECTION MULTI-WORK SCOPE
Enhancing efficiency: Integrated Certification & Inspection team expedite comprehensive workscope during critical docking period.
MONUMENTAL PROJECT SEES MOTIVE EXECUTE LARGEST BUILD TO DATE
Excellent collaboration, detailed planning and extensive engineering delivers unique solution of immense proportions.
TRUSTED ENGINEERING WITHIN ACCELERATED TIMEFRAME KEEPS PROJECT ON-TARGET
A long-term client approached Motive Offshore in late 2020, knowing that our Engineering team has a reputation for producing outstanding work within challenging timescales. The requested work scope, which would usually take approximately three months to deliver, was required within just five weeks.
GLOBAL 1201 SPOOLING WINCH SERVICES FOR TECHNIP FMC
Motive FZE was contracted by Technip FMC to supply a 75Te WLL Spooling Winch and a technician to remove and install crane wires on the G1201 at the Drydocks facility, Dubai.
VESSEL MOBILISATION AND SEAFASTENINGS
This project was initially requested for a 12-hr day shift to carry out a vessel demob/mob and davit/winch seafastenings onboard the Siem Spearfish. Growth in project activities during the work scope relied on Motive adapting resources and deploying additional manpower at short notice to ensure the vessel remained on-schedule.
URGENT TECHNICAL SOLUTION PROVIDED FOR RECOVERY OPERATION
Following the supply of a full back-deck spread for a cable lay installation, Motive was again commissioned by the subsea contractor to provide an urgent recovery solution when the product suffered damaged subsea.
MOTIVE CARRIES OUT SUBSEA TREE LOADOUT FOR BAKER HUGHES
Motive has been commissioned by Baker Hughes to carry out transit sea-fastenings on 108 Baker Hughes subsea trees, onboard cargo vessels.